Managing the CIGÉO Design: A Challenge and an Opportunity
Author(s)
Roberto Muscetti
Full-Text PDF XML 1127 Views
DOI:10.17265/1934-8975/2015.12.003
Affiliation(s)
International Projects Development Program, INGEROP Group, Cébazat 63118, France
ABSTRACT
INGEROP has been working for years on the French deep geological repository’s
design for ANDRA, carrying out since 2012 the preliminary design, the global project
management and the technical integration for the engineering of the CIGÉO
project (in a 50-50 consortium with the French company TECHNIP). The article
presents some particular organizational aspects that, turned out to be more challenging than foreseen
in the course of our activities. Starting from the presentation of real
examples, some lessons learned are derived as well as practices of interest in
solving analogue issues in similar projects, with focus on its application to
the management of the engineering phase of geological repositories
and other’ megaprojects’ in different countries.
KEYWORDS
Radioactive waste, disposal, repository, geological, organization.