[email protected] | |
3275638434 | |
Paper Publishing WeChat |
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License
An Overview of the Feasibility of Achieving Level 2 Building Information Modeling by 2016 in the UK
Abdulkadir Ganah and Godfaurd A. John
Full-Text PDF XML 1665 Views
DOI:10.17265/1934-7359/2015.08.001
The Grenfell-Baines School of Architecture, Construction and Environment, University of Central Lancashire, Preston PR1 2HE, UK
The aim of this study is to investigate the current status and feasibility of achieving Level 2 BIM (building information modeling) usage that is to be made mandatory by the UK government on its projects by the year 2016. This study assesses the level at which organizational and practitioner knowledge of BIM is currently positioned. The UK government, being the largest public stakeholder client, has realized the benefits and advantages of BIM when used in procuring projects across their lifecycle in the built environment. A critical review of the BIM literature was carried out and the evidence base was created in relation to government targets for 2016. At the current stage, Level 2 BIM adoption is achievable by 2016 for large construction firms but not for SMEs (small medium enterprise). Also, from evidence in this study, the technology needs to be properly tailored to meet SME variables if Level 2 status is to be achieved for the entire industry.
Adoption, BIM, construction, levels.